nyc dot traffic standard drawings

ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. The Highway Rules, Section 2-07(c) (4) contains additional information. ). 55 Water Street, Concourse Level A $35 filing fee is required for all vault applications. Jamaica, NY 11435 After the canopy passes final inspection, HIQA will release the hold and the applicant must return to the Permit Office to obtain the permit to maintain the canopy. LOCAL AND EMERGENCY ACCESS MUST BE PROVIDED FROM EACH END OF THE BLOCK AT THE INTERSECTIONS WITH USE OF FLAGGERS AND SIGNAGE. TWO HUNDRED TWENTY OF THE LABOR LAW, PAID TO THOSE SO EMPLOYED. 80-30 Park Lane Street resurfacing in progress. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. Brooklyn, NY 11201 PERMITTEE MAY ALSO OCCUPY ONE TRAVEL LANE ADJACENT TO EAST CURB LANE 830PM TO 4:30AM.NIGHTLY FROM 10/4 THROUGH 10/15. CRITERIA & PROTOTYPE FOUND AT: THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB LANE ONLY RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. 24 West 61st St., 5th Fl. The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. However the permit window remains open until 3:15 PM to pick up permits. If any proposed work is within 100 feet of a bridge or structure, applicants must submit a scaled drawing showing the work and exact location. TO FRI. NYC DOT coordinates street opening and other construction on streets. The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. AT REQUEST OF DEP LETTER DATED 6/16/05 WITH C.B. NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. A street is considered to be protected for five years from the date it was last resurfaced or reconstructed. Building Operations/Construction Activity Permits are generally taken out by entities that perform construction activities, including developers and contractors. Excavators use those markings to help identify underground facility locations in order to promote public safety and to prevent damage to public and private property. (16 NYCRR Part 753), Additional information can be obtained by contacting New York 811 at 800-272-4480, or visiting the New York 811 Website. During the processing of the permit, if there is a hold, the applicant is notified of the type of hold and the steps the applicant must take to release the hold. AN EMBARGO WILL BE IN EFFECT FOR THIS AREA SATURDAY AUGUST 2, 9 AND 16 FROM 12:01AM TO 6:00PM. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND,YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. Only a canopy installer or authorized agent that is registered with NYC DOT can apply for a permit to install the canopy. If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. Access the, If the applicant intends to fully close a roadway, a. Brooklyn, NY 11202 TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. Copy of E.I.N. One Fordham Plaza, 5th Fl. Kew Gardens, NY 11424 Applicant should submit this form with the appropriate documentation and waiver request fee. Further information on responding to CARs may be found in the Highway Rules, Section 2-02(d). Customer Service: (718) 802-3675, Manhattan This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. 30-30 Thomson Avenue, 4th Floor For further information, call (212) 839-9435. WALKWAY MUST BE RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY. APPROVED PLANS MUST BE ON SITE. Further information on insurance and bonds is available in Chapter 3 Permits and Approvals and in Section 2-02(a) of the Highway Rules. For failure to comply with the terms or conditions of such permit, the Highway Rules or other applicable law in carrying out the activity for which the permit was issued; Whenever there has been any false statement or any misrepresentation as to a material fact in the application or accompanying papers upon which the issuance of the permit was based; or. MAINTAIN 5 FOOT PED. Plumbers*: Enter the plumber's license number and name on license (if applicable). Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. WORK SOUTHBOUND 9AM-6PM M-F AND 9AM-6PM SAT/SUN. "Backfill" refers to the bottom layer of the restoration. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. If a permit is about to expire and the permittee has not completed the work, the permittee must apply for a permit renewal as all work must be performed pursuant to an active permit at all times. To this end, the Street Works Manual is a resource for all parties that perform work in New York City streets, from utilities and contractors installing, replacing and repairing underground infrastructure to developers replacing roadways and sidewalks adjacent to building sites and homeowners performing their own sidewalk repairs. USE OF METERED,AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED. Office hours: 8:30 AM-3:30 PM. Applicants who are registered as permitees (see Section 3.2) and are registered for on-line permitting can log-in to NYCStreets and submit a request for an emergency street opening/excavation permit. It also outlines principles for coordinating with NYC DOT when proposing excavation work to help make certain that excavation on streets occurs before or in conjunction with city street work, where practicable. These are in addition to the "Common Requirements" listed at the beginning of this section. MAINTAIN 5' SIDEWALK AT ALL TIMES. CTDOT_Traffic . SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN, ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). Suspension of Application Review NYC DOT may suspend the review of applications for permits pending: Refusal to Issue Permit NYC DOT may refuse to issue a permit to an applicant: Voiding and Reissuing of Permits. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. Tel: (718) 815-8541 on hearing days This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Applicants should indicate on the application, Application for Governmental Work Permit(s), their name and the name of the governmental agency or authority for which they are working. Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. Please open each of the below search results in a new tab or window (using a right-click or CTRL-click) to alleviate an occasional error that may occur when using a browser's back button. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". PERMITTEE IS AUTHORIZED TO RESTRICT PARKING IN FRONT OF WRK ZONE & ALONG THE OPPOSITE CURB LN OF WRK ZONE USING NYPD PAPER SIGNS STATING DAY(S) OF WRK. DOT uses higher wattages on wide or commercial corridors and lower wattages on narrow or residential streets. 2 HOURS BEFORE UNTIL 2 HOURS AFTER ALL YANKEE HOME GAMES ALL MOVEMENTS INTO AND OUT OF THE SITE ARE RESTRICTED ALONG EXTERIOR STREET. New York 811 then relays digging and excavation requests to its member network of utility companies and underground facility owners, who are required to mark the location of their underground facilities within two working days. MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. PERMITTEE MUST EMAIL DEP AT. AREAS WHERE THE MINIMUM CANNOT BE ACHIEVED, CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM THE DEPARTMENT. 120-55 Queens Boulevard 1400 Williamsbridge Road, 1st floor Staten Island, NY 10301 Special Notice: This edition was finalized before the state of emergency due to COVID-19; as city processes adapt in response to the crisis, they may temporarily differ from the guidance provided here. Queens.Forestry@parks.nyc.gov THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. The first option (see Diagram 1) is by using the DOT on-line NYCStreets Permit Management system. Standard Drawings are not currently available for download from the shaded states. Please note that although permits can be submitted, paid for and printed out 24/7, the permit review process occurs only during normal weekday Permit Office hours. FLAGGERS ARE REQUIRED FOR ALL MOVEMENTS IN AND OUT OF SITE AT ALL OTHER TIMES. The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. For hearings, 1st, 2nd, 3rd, and 4th Wednesdays and Thursdays of the month from 8:30 AM to 3:30 PM Call before you dig. Click here to view a sample certification formand in Appendix B, Forms. WORK INCLUDES: CURB/SIDEWALK REPAIR AS NEEDED; ROADWAY MILLING/REPAIR AND RESURFACING; REMOVAL OF CENTER MEDIAN; RESETTING UTILITY OPENING; REMOVAL/REINSTALLATION OF TRAFFIC SIGNALS INCLUDING CONDUIT; INSTALLATION OF PAVEMENT MARKINGS AND PARKING SIGNAGE. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 204 PERMIT TO MAINTAIN THE FENCE & AN ACTIVE TYPE 215 PERMIT. A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. Check all types of work that will be performed by the applicant or his/her corporation. At that point, OCMC executive staff will determine if additional permit stipulations are required. WAIVER TO WORK DURING 2010 HOLIDAY EMBARGO GRANTED FOR THIS PERMIT. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. IF CURB LANE BECOMES A TRAVEL LANE THIS STIP DOES NOT APPLY. In addition, a vault license from NYC DOT's Office of Franchises, Concessions and Revocable Consents is required to construct a new building vault or enlarge an existing building vault. It is essential to call New York 811 before digging anywhere, including sidewalks and soil. PRIOR TO BEGINNING ANY WORK, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). Brooklyn, NY 11211 Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. Any foundation material not meeting specifications must be removed. WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. FLAG PERSON MUST BE PROVIDED TO STOP PEDESTRIAN AND/OR VEHICLE TRAFFIC WHILE LIFTING MATERIALS OVERHEAD AND ALSO WHEN CROSSING SIDEWALK IN CONJUCTION WITH CROSSING SIDEWALK PERMITS. Customer Service: (718) 286-0600, Staten Island There are separate permit applications for governmental work, Canopy Permits, and permit renewals and re-issuance, all of which are explained later in this chapter. SUMMER RELIEF SYSTEM UPGRADE. It also helps NYC DOT to identify opportunities for joint bidding and to coordinate the timing of the agency's resurfacing and reconstruction activities. The streets themselves also serve as public spaces, fostering social, economic and recreational activities. A Full Closure Review (FCR) hold is triggered when a street is closed for 90 days. Fax: 212-720-3219, Manhattan or Tax I.D. MUST CONTACT NYSDOT ENGINEER IN CHARGE NIGHTLY TO COORDINATE. Policies; Accessibility; About CT; (5mb). Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. DOT is also testing solar-powered lighting at select locations in flood-prone areas. FOR DRILLING OPERATION MAY WORK 7AM-6PM MONDAY - FRIDAY IN CURB LANE AND PART OF SIDEWALK. (212) 839-2387/88/89 This category of permits applies to openings/excavations or other work in a street that may cause damage to the street surface or to any work that the Permit Office believes would compromise the street surface. WORK 9 AM TO 7 PM EXCEPT SUNDAY. Key principles for effective coordination include: Provide Notice of Planned Street work at Earliest OpportunityThe basic principle of providing adequate advance notice is the greater the disruption, the longer the notice period needed. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. Some of the features on CT.gov will not function properly with out javascript enabled. The Highway Rules, Section 2-02(k) contains additional information. Restoration Once work in the street has been completed, permittees are required to restore the street excavation to provide a smooth riding surface. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. All addresses must be the same on all above referenced documents. City Hall, 3rd Floor It includes capital construction projects. 30-30 Thomson Avenue, 4th Floor Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. AS PER STIPULATION MEC04-246 AND PROJECT PLANS DATED 04/30/04 WHICH MUST BE ATTACHED TO PERMIT. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR FULL INTERSECTION RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. THE SIGNS SHOULD BE POSTED ON ALL POLES AND DRIVE RAILS ON THE SEGMENT AFFECTED INDICATING THE DATE OF THE CHANGE, THE NEW REGULATIONS AND A TELEPHONE NUMBER TO OBTAIN INFORMATION. (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. Outlined below are the basic application procedures for Sidewalk Construction Permits. ALL OCCUPANCY OF THE ROADWAY SHALL BE CONFINED TO THE PARKING LANE ONLY, WITH NO IMPACT ON THE BIKE LANE OR TRAVEL LANES AT ANY TIME. MAXIMUM OF 11 FEET OF ROADWAY MAY REMAIN CLOSED AFTER WORKING HOURS ONLY FOR CONCRTETE CURING. MUST COORDINATE WITH RESIDENT ENGINEER NYSDOT MR.WONG AT 718-499-7075 PRIOR TO WORK. ROADWAY MUST BE RESTORED IN KIND. MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. Manuals and Standards. This New York 811 marking shows where a cable television line is located beneath the sidewalk. Private homeowners applying for Sidewalk Repair Permits who will be making the repairs themselves may apply for permits by mail. Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. The second option is available for applicants who do not have the technology to use the above procedure. Kew Gardens, NY 11424 The CGL policy should provide coverage in the amount of no less than $1 million combined single limit per occurrence, except for applications for permits to place a crane on a street, which requires $3 million combined single limit per occurrence. Longitudinal SlopeThe longitudinal slope of the sidewalk must be uniform and parallel to the curb at the curb's proper grade. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. They are accessible for the few years before September 2015, and for thelettings since September 2015. Permits (hazardous storage/operations) (718) 999-2457, New York City Department of Information Technology and Telecommunications (DoITT) Department of Transportation Fax: (212) 669-3844, New York City Office of Emergency Management (OEM) At the HIQA borough office, applicants will be given a Canopy Authorization Application (. "Base course" refers to the layer of material below the wearing course. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR SPECIFIC TRAVEL LANE RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Certification by the manufacturer that the covering is flameproof. Workers pour cement during sidewalk reconstruction. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. MAINTAIN 1 LANE IN EACH DIRECTION FROM 9AM-4PM M-F AND 9AM-6PM SAT/SUN. ALL WORK SHALL ALSO BE COORDINATED WITH ALL OTHER ONGOING CONSTRUCTION IN THE AREA. NYC DOT hosts borough-level meetings to discuss the scheduling of upcoming resurfacing projects with utility companies and other potential street excavators. NYC Parks & Recreation 16 Court Street, 7th Fl. 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Share long-term capital plans for planned repairs, upgrades and new If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. Each canopy maintenance permit expires one year after the date of issuance, unless revoked sooner by NYC DOT. For Holds: (212) 748-6609 USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. BACKFILL/COMPACT IN 12 INCH LIFTS. Similarly, the sooner a potential street excavator knows about NYC DOT's intent to work in a particular location, the better it can make arrangements to avoid or reduce potential conflicts. A list of construction embargoes under way at any given time can be found on the Construction Embargoes page on NYC DOT's website or at the borough Permit Offices. Abuilding vault, as described in Section 2-13 of the Highway Rules, is any opening below the surface of the street that projects outside of the property line and is covered over, except for those openings: (1) used exclusively to access, by means of steps, the cellar or basement of any building; (2) used primarily for light and ventilation; (3) constructed or maintained by utility companies (including transformer vaults); and (4) which are subways, railroads and related structures. DESIGNATED AS COBBLESTONE STREET. THIS STIP IS USED FOR WORK IN AN INTERSECTION. Notes: 1. DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. Street Opening Permits are generally taken out by entities that need access to subsurface infrastructure, including utility companies and contractors, such as licensed master plumbers. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. Once OCMC executive staff determines the final permit stipulations, the permit will be released. For Holds: (718) 222-7231 ANY STORAGE OF MATERIAL OR STORAGE OF EQUIPMENT REQUIRES A SEPARATE PERMIT. Click here to access theHighway Rules. Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths.